Laserfiche WebLink
SAN JOAQUIN VALL- UNIFIED AIR POLLUTION CON'S OL DISTRICT <br /> r <br /> Compliance_ Assistance"Bulletin ;December,1994 <br /> Asbestos-Synopsis <br />� l�?Initions,Cantlr7uetl y r <br /> Regulated Asbestos Containing (1} F.,nable ashes#os-containing material(ACM} <br /> Materials rRACMI Inplude 2,Gate 1 nonfrrable ACM'i <br /> poor condition and"has become fnable or that fias or <br /> l = Wali be`subfected to sanding,gtrnding cutting o_r abrading <br /> r (3}Category II non#rrable ACM that has a high probabrltty of becoming or"as become <br /> crurrbied,ptjlvenzed'br reduced 10 powder by the forces expected 16act" the;ritatenal <br /> r 'Int cours0 ofderriolitian or renovation <br /> Frra6laAsbestas Conta+nrng Any naterial,containing more than 1 percent asbestos,as deterriitned bylPolarrzeif tight T <br /> Maferra!"fAG1L1f " Microsco PLM #esttri which,"wh i -a can be�crurribled' ulvenz <br /> pY[: ). gl". rY. p , ed,'or reifuced't0 <br />' powder by:hand pressure.° <br /> - =r <br /> Category f nonfirable.ACM Any.,asbestos containing packings,gaskets;"resit+ent;floor coverings and'aspfialt roofng <br /> products containing more than 1 percent asbestos=as determined"by PLMttesting. <br /> Category 11 nonfriable ACM: Any asbestos-containing materials,excluding Category t ACM,containing more than i <br /> percent.asbestos as determined by PLM testing,which when dry,cannot be crumbled, , <br /> ! pulverized,or reduced to powder by handpressure: . <br /> r Ins eetion•.done b or under the direction of a"Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> O Any renovation activity in which more than 160 sq.ft.of any building material or 260 linear feet of pipe insulation will be"disturbed. <br /> An inspection is not required,if the material to be disturbed is stipulated to be asbestos-containing and will be removed in <br /> accordance with the NESHAP. <br /> Impection Re o�tlSt lnrfude: <br /> O A schematic showing the location of all tested materials. <br /> ® The following data for all asbestos-containing materials: <br /> 1.The amount and description of each material. <br /> 2.Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to time District at least 10 working-days-prior to: <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 160 sq,ft.or 260 linear ft.of RACM will be disturbed. <br /> A copy of the Asbestos Inspection Report must be included with the Notification. <br /> Notification will not be considered complete,not will the 10 working day notice period begin until all required information and fees <br /> have been submitted to the District. <br /> Fees:District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects, <br /> Demolition Release Form:The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with,or exemption from,the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> t complied with, the District will issue a Demolition Release Form to the person who submitted the notification. <br /> f <br /> Recycle and Waste Disaosal:The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> f <br /> I <br /> r <br /> I <br /> L <br />