Laserfiche WebLink
k ATTACHMENT C <br /> KRC AGGREGATE, INC., EIR } <br /> MITIGATION MONITORING PLAN <br /> (For Significant Impacts Only) <br /> i <br /> VEGETATION AND WILDLIFE RESOURCES <br /> Mitigation Measure: Obtain a Tree Management Permit from the San Joaquin County Community <br /> Development Department, pusuant to Section 9-1505.3. <br /> • Monitoring Requirement: Submit application. <br /> • <br /> Person/Aaencv Res onsible: San Joaquin County Community Development Department. <br /> • Timing or Frequency of Monitoring: Prior to approval of the Improvement Plan. <br /> Mitigation Measure: Avoid or reduce loss of blue oak woodland by excluding the nine acres of blue oak <br /> woodland shown on the map entitled "Location of Biological Resources' from within the boundaries of <br /> excavation. w <br /> i <br /> • <br /> Monitoring Requirement: Show revised excavation boundary on the Improvement Plan. <br /> • Person/Agency Responsible: San Joaquin County Community Development DepartmI Fent. <br /> • <br /> Timing or Fredluency of Monitoring: Improvement Plan, <br /> Mitigation Measure: Compensate for the loss of Native Oak and Heritage Oak Trees, pursuant to Section <br /> 9-1505.4 of the County Development Title,which outlines replacement guidelines for removal of native and <br /> heritage oak trees. These guidelines require that each heritage oak tree removed be replaced with at <br /> least five trees or acorns and that each native oak tree removed be replaced with at least three trees or <br /> acorns. Based on these replacement requirements, KRC Aggregate shall plant 1282 to 2460:blue oak <br /> acorns over the 20 to 25 year term of the project, depending upon the extent of the impacts to the blue ' <br /> oak woodland. Replanting shall be consistent with the guidelines specified in Mitigation Measure 4.2-1 <br /> contained in the EIR. This information shall also be included in the Reclamation Plan. <br /> j I <br /> • <br /> Monitoring Requirement: Oak revegetation shall be included in the revegetation efforts done at <br /> the conclusion of each phase. I <br /> 11 � <br /> • <br /> PersonLAc <br /> jencyResponsible: San Joaquin County Community Development Department. <br /> i <br /> I� <br /> • Timingor Fre uenc of Monitorin Annual inspection conducted by the County in compliance <br /> with SMARA. This will be monitored throughout the life of the project. <br /> Mitigation Measure: Before initiating excavation activities that would result in the filling or degra: ation of <br /> waters of the United States, KRC shall coordinate with the Army Corps of Engineers and DFG to obtain <br /> permits, if necessary. <br /> j <br /> San Joaquin County OX-94-2/KRC Aggregate <br /> Community Development (page 25 <br />