Laserfiche WebLink
Monitoring Requirements: Contact DFG to determine if a streambed alterationl�agreement <br /> (California Fish and Game Code Section 1603) is required for activities that may affect ephemeral <br /> drainages on the project site. If surveys of the vernal pools conclude that no vernal pool fairy <br /> shrimp or vernal pool tadpole shrimp exist in the vernal pools on the site, it would ao'pear that fill <br /> activities would be authorized by the Corps under general permit (Nationwide Permit 26). <br /> A <br /> Person enc Res onsible: Army Corps of Engineers and DFG. 1i <br /> Timing or Frequency of Monitoring: Prior to excavation in phases containing ephemeral drainages <br /> or wetlands. <br /> Mitigation M <br />� easure: Avoid filling or degrading waters of the United States, including wetlands, by <br /> redesigning the project's excavation boundaries to avoid as many of the vernal pools as possible. At a <br /> minimum, the excavation boundaries at the southwestern portion of the site shall be revised;to exclude <br /> the concentration of vernal pools. j <br /> • Monito_ri_ng Requirement: Show revised excavation boundary on the Improvement Plan. <br /> i{ t <br /> • Person Agency Responsible: San Joaquin County Community Development Department. <br /> h I <br /> • Timinq or Frequency of Monitoring: Improvement Plan. <br /> Mitigation Measure: Compensate for filling or degrading waters of the United States, including wetlands, <br /> if impacts are unavoidable. KRC Aggregate shall compensate for the loss by retaining ar'estoration ! <br /> ecologist to prepare a wetland mitigation and monitoring plan. <br /> 1 <br /> Monitoring Requirement: Prepare a wetland mitigation and monitoring plan acceptable to USFWS. <br /> i <br /> • Person A enc Responsible: USFWS, DFG, Army Corps of Engineers. <br /> 'i <br /> F <br /> • <br /> Timing or Freguency of Monitoring: Prior to excavation in phases containing ephemeral'drainages <br /> or wetlands. <br /> Mitigation Measure: Conduct summer surveys (June-July)for late-blooming special-status plants before <br /> initiating excavation activities in areas supporting vernal pool and seasonal wetland habitat. j <br /> • <br /> Monitorina Re uirement: Conduct surveys. p <br /> • <br /> Person/Agency Responsible: USFWS, DFG. <br /> � I <br /> Timing or Frequency of Monitoring- Prior to excavation in phases containing vernalpools and <br /> seasonal wetlands. R <br /> i <br /> Mitigation Measure: If special-status plant populations are located during field surveys, populations i <br /> should be avoided to the extent possible. } <br /> • Monitoring Requirement: Show revised excavation boundary excluding areas containing special- <br /> status plant populations on the Improvement Plan. i 1! <br /> • <br /> Person/Agency Responsible: San Joaquin County Community Development Department. <br /> San Joaquin County <br /> y QX-94-2/KRC Aggregate j <br /> Community Development (Page 28 <br />