Laserfiche WebLink
I <br /> I <br /> QX-91-4(QUESTO) <br /> MITIGATION MONITORING PROGRAM <br /> IMPACT <br /> MITIGATION MONITORING ACTION RESPONSIBILITY <br /> TIMING <br /> Soil Erosion Vegetation and overburden shall t <br /> Final grading and rehabilitation plans shall Primary responsibility belongs to the The final grading and reclamation plans must <br /> not be removed from an area until the area Incorporate the mitigation measures. <br /> Development Services Division. have final approval by Development Services <br /> is 10 be excavated. The overburden shalt <br /> be replaced upon reclamation. No The Development Services Division will The Mine Reclamation Program office of the prior <br /> tto beginning operations. <br /> overburden shall be removed from the site. Inspect the site annually and prepare an State Department of Mines will review the final The annual inspections will be made prior to <br /> Stockpiled soil or material shall not be annual report. grading and reclamation plans,the security June,17 each year. <br /> scored within25- <br /> shfeet of a property deposit,the annual reports and the Certificate <br /> boundary and shall be managed to � <br /> minimize water and wind erosion, of Completion. The Certification of Compliance Is required <br /> A security deposit Is required to ensure that The Department of Public Works will review the before the security deposit will be refunded. <br /> Final and temporary slopes shall not the reclamation of the site conforms with the amount of the security agreement. County ' <br /> exceed 2-feet horizontal to 1-foot vertical. approved permit. <br /> Counsel will review the form of the agreement. <br /> All water utilized In the plant operation Certification of Compliance, prepared by a <br /> shall drain or be pumped Into the main registered civil engineer, Is required upon I <br /> reservoir for recycling. completion of the excavation and I <br /> rehabilitation. <br /> All retaining basins,settling ponds, ditches, <br /> and diking shall be to the specifications of <br /> approved grading and reclamation plans. i <br /> As part of the reclamation plan, A revegetation plan Is required. The Soil Conservation Service will review the The rave station Ian <br /> protective vegetative planting is required 9 p approved by the Soil <br /> for the entire site. The type and method of revegetation plan. Conservation Service,Is required prior to. <br /> seeding shall be to the specification of the approval of the final reclamation plan. <br /> Soil Conservation Service. <br /> .I <br /> a <br /> +l <br /> r <br /> R <br /> 4' R <br /> Y <br />