Laserfiche WebLink
the 2 years of post-mining revegetation monitoring. Management will <br /> include mechanical and chernical methods. Monitoring for weeds will <br /> include ail weeds identified as invasive or noxious by the California <br /> Invasive Plant Council, California Department of Agriculture, or County <br /> Agricultural Commissioner. <br /> 3) DESCRIPTION. OF PROPOSED RECLAMATION: <br /> a) Subsequent Use(s): <br /> All disturbed land will be reclaimed back to farming capability; proposed to be <br /> wheat or corn the first two years after reclamation and subsequently <br /> thereafter alfalfa row crops or an orchard. All property owners of possessory <br /> interest have been provided a copy of the proposed project and reclamation <br /> plan. <br /> b) Reclamation Schedule <br /> Upon the removal of all sand field to be leveled with laser land leveling <br /> equipment. Leveling and sand removal to be done in two phases. After the <br /> field has been leveled; field to be deep ripped and disked for farming. The <br /> property basically remains the same after the leveling, but more productive. <br /> See Attachment "A" for maps. Reclamation is to be done concurrently and to <br /> coincide with excavation of sand removal. <br /> By removing the top laver of sand the soil below is heavier and richer and will <br /> increase the sparse production of the past to a more farmable ground and <br /> insure less water usage and loss of water. <br /> c) Post Mining Topography <br /> See Attachment "A" post reclamation topography, drainage; benches, roads, <br /> cross sections through slopes, cuts, fills, original ground, post-mining surface, <br /> geologic conditions, reclaimed surface, and other pertinent features are <br /> shown on the attached Reclamation Plan. Slopes will not exceed 1.5, and <br /> stabilization should not be a problem <br /> d) Impoundments <br /> No impoundments are proposed for this property. <br /> e) Drainage <br /> The land is very sandy and any one water truck will be used for dust control <br /> and watering the sandy material to be removed. Land to be leveled with a <br /> 5 <br />