My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0046344
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALCALA
>
243
>
2600 - Land Use Program
>
SR0046344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 9:22:24 AM
Creation date
9/4/2019 10:47:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SR0046344
PE
4301
STREET_NUMBER
243
Direction
W
STREET_NAME
ALCALA
STREET_TYPE
AVE
City
MOUNTAIN HOUSE
Zip
95391
APN
25634009
ENTERED_DATE
4/12/2006 12:00:00 AM
SITE_LOCATION
243 W ALCALA AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BYRON\18692\WELL PLN CK\SR0046344.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. In the event that work is required on any well,including but not limited to plugging and abandoning, <br /> reabandonment, cutting off casing,or adding a riser,written permission is needed from the Division. <br /> r H.All conductors must be plugged with cement and leak tested by a Division inspector. <br /> I.The outermost casing stub of all wells within the construction site should be maintained within 5 to 10 feet below <br /> the surface of the final grade.The casing can be cut off or a riser added to achieve the required depth. <br /> ALL WELL WORK MUST BE COMPLETED BEFORE ANY CONSTRUCTION-SITE PLAN APPROVAL IS <br /> ISSUED. <br /> Construction-Site Plan Requirements <br /> To conduct a review,the Division requires three copies of the plan along with a completed Construction-Site <br /> Review Application(PDF)that must be submitted to the appropriate Division district office. <br /> Following well-location verification and testing,the applicant must correctly plot the well location on the <br /> construction-site plan map. Each well must be identified with the official name of the company/operator and the <br /> well designation.Wells in proximity,but outside the construction site,should also be plotted to verify their <br /> locations. <br /> The construction-site plan should indicate the property and/or construction site boundaries,footprints of proposed <br /> structures,and existing structures that will remain.Also,existing and proposed oilfield facilities(tanks,processing <br /> equipment,enclosures, pipelines,etc.)that will be operating on the site after completion of the proposed <br /> development should be included. <br /> The applicant should include a description of the existing type and height of all facility enclosures(e.g.,fencing) <br /> r. and list any modifications that are part of the construction-site plan. <br /> Any conductor casing found on the site must be plotted on the construction-site plan and listed on the <br /> Construction-Site Plan Review. <br /> Conducting Gas Tests on Wells <br /> ` The Division requires that all accessible wells be located and tested for gas and/or oil leakage. Division staff <br /> conducts the test using the following guidelines: <br /> 1. Standing Water Test: Cement that is flush with the top of the casing is chipped down so that water poured on <br /> top is allowed to pool.This test consists of observing any bubbling through standing water in the casing and <br /> annular spaces. If bubbling is noted,the source of the bubbling must be ascertained. If the bubbling is from air <br /> displaced from micro fractures in the cement,the bubbling will cease within a short time. <br /> 2. Soap Test:A soap solution is sprayed on all exposed portions of the wellhead.Any bubbling is tested for <br /> combustible gasses with a sensitive testing instrument. <br /> 3. Bag Test:This test involves attaching a plastic bag over the casing and testing the vapor in the bag with a <br /> _ sensitive testing instrument.This method can be used in an empty annulus prior to approving a surface pour. <br /> If there is any indication of oil or gas leakage,or if the surface plug does not have competent cement in the casing <br /> and/or annular spaces,the well needs to be reabandoned. <br /> Obtaining a Permit to Work on a Well <br /> If any well requires plugging work or extending or cutting casing,and that well has been previously plugged and <br /> abandoned,the applicant must file a Supplementary Notice(to Abandon)(Form OG123R)(PDF)with the <br /> appropriate district office. If the well has not been previously plugged and abandoned,then a Notice of Intention to <br /> Abandon(Form OG108)(PDF)must be fled with the appropriate district office.When the well work is completed,a <br /> Report of Operations(Form OG109)will be issued. <br /> What Will You Receive From Us? <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.