Laserfiche WebLink
I - <br /> Aou1N <br /> COUNTY OF SAN JOAQUIN EUGENEDELUCCHi <br /> < DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> . P.O.BOX 1810- 1610 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> C4�!F pRa�P <br /> (209)468-3000 MANUEL LOPEZ <br /> DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> RICHARD C.PAVNE <br /> DIRECTOR .! d DEPUTY DIRECTOR <br /> March 3 , 1992 <br /> f M,E M 0_R A N_DrU M <br /> TO: Thomas M. Gaul Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Richard Larrouy <br /> FROM: Charles Kelley, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SU-92-6 Major Subdivision Pre-applicatio o subdivide <br /> a 30. 79 acre parcel into 12 lots of approximately 2 acres each and <br /> 1 four acre lot with a vesting map. General Plan Map Amendment <br /> Pre-application to change the designation of 30. 79 acres form <br /> agriculture to Rural Residential. Zone Reclassification Pre- <br /> application to redesignate acreage form AL-10 to RR-65. Located <br /> on the S. side of Calimyrna Rd. at the S. end of Eunice Rd. , N. of <br /> Acampo. <br /> APPLICANT: Acampo Estates APN: 005-145-3 , 5 <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Calimyrna Road has an existing right-of-way width of 40 feet, and <br /> a planned right-of-way width of 50 feet. <br /> Emerson Road has an existing right-of-way width of 40 feet, ,and a <br /> planned right-of-way width of 50 feet. <br /> THE FOLLOWING COMMENTS AND RECOMMENDATIONS ARE FORWARDED FOR YOUR <br /> CONSIDERATION, CONCERNING THE APPROVAL OF THIS APPLICATION. <br /> RECOMMENDATIONS: <br /> 1. All improvements shall be in conformance with the Improvement <br /> Standards and Specifications of the County of San Joaquin. <br /> All improvement plans and specification must be approved by <br /> the County of San Joaquin Department of Public Works prior to <br /> approval of the Final Map. (Planning Title Section 9-9135) <br /> 2 . If improvements referred to herein are not completed prior to <br /> the approval of the Final Map, the subdivider shall execute <br /> an agreement with the County of San Joaquin insuring the <br /> completion of improvements within one (1) year after filing <br /> the Final Map. (Planning Title Section 9-9133) <br />