Laserfiche WebLink
i <br /> COMMENTS ON DEVELOPMENTS <br /> SU-92-6/GP-92-8/ZR-92-8 PRE-APPLICATION <br /> 3 . Traffic circulation shall be revised to align entrance off of <br /> Calimyrna Road with Looser Road to the north; and Emerson Road <br /> shall be continued west and connected with entrance road. All <br /> interior roads shall conform to minimum centerline radii of <br /> 300 ' and be named, dedicated, and improved to County Standards <br /> for 50 ' right-of-way rural roads, except cul-de-sac streets <br /> which may be rural residential roads. <br /> (Planning Title Section 9-9:135) 'f <br /> 4. Dedication to result in a 25-foot wide right-of-way from the <br /> centerline of Calimyrna Road to the property line shall be <br /> required and improved on the subdivided side to County <br /> standards for a 50-foot right-of-way rural road. <br /> (Planning Title Section 9-9:135) <br /> 5. A storm pond shall be provided on each lot to meet the <br /> requirements of the County and to provide adequate drainage <br /> for the subdivision. <br /> (Planning Title Section 9-9404) <br /> 6. Street lighting shall be provided for the street intersections. <br /> (Planning Title Section 9-9301) r <br /> 7 . The property shall annex to County Service Area No. 49 prior <br /> to approval of the Final Map to provide for �the operation, <br /> maintenance, and improvement of street lighting facilities. <br /> (Planning Title Section 9-110003) N <br /> 8 . The Traffic Impact Mitigation Fee will be required when <br /> parcels are developed. The fee is due and payable at the <br /> time of building permit application. (The fee currently is <br /> $2 , 930. 00 per single family dwelling unit in the Lodi area - <br /> The fee shall be automatically adjusted July l of each year by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> 9 . This subdivision is approved for recording as a single unit, <br /> phasing is not approved. <br /> (Planning Title Section 9-9:353) <br /> 10. A Preliminary Soils Report .is required in accordance with <br /> the County Standards for the purpose of determining the <br /> R-Value for the design of the roads. <br /> (Planning Title Section 9-9:104) <br /> 2 <br /> i <br />