Laserfiche WebLink
Page 3 of 3 <br /> well casings was resurveyed. The elevations for MW-1 through MW-7 comported exactly with those <br /> originally reported in Table 3 of the initial site characterization report (2001), which elevations have <br /> been used by SJC in every GeoTracker upload, monitoring report, work plan and site characterization <br /> done at the Navarra Property. <br /> I hope this addresses your concerns. Please reply if you still have questions or comments regarding these <br /> issues. <br /> Sincerely, <br /> Brooke Disbrow <br /> Project Manager <br /> The San Joaquin Company Inc. <br /> cc. Dai Watkins <br /> 12/3/2003 <br />