Laserfiche WebLink
Carl B. &Annamae F.Navarra -2- March 17, 2000 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Dietz Irrigation proposal in my'pre-approval above for the backfill <br /> and compaction portion of the work,please be aware that you will be entering into 'a private contract: <br /> _ <br /> the State of California cannot compel you to sign any specific contract. This letter pre-approves the <br /> _ costs a pi=esn`led n 11Te pioposal-d-a e-d-FelSrua`ry 1-0 22000-Vy—D-i�Ez-lrrigatitn an'd-in'accordancerto- -- <br /> Table 1 Reasonable Cost of the Fund letter dated January 12, 2000 for conducting the work approved <br /> by the County. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring.contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services, don't hesitate to call <br /> me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultant prepares their invoices to include the <br /> required break down of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided far any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence front the County. <br /> Flease call if you have any questions, I can bc-reached at-(916)2274518- <br /> Sincerely, <br /> !Wennilyn�Fua, ter R ources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> / San Joaquin County EHD <br /> 1/ F.O. Box 2009 <br /> Stockton, CA 95201 <br /> California En vironmental Protection Agency <br /> Qi Recycled Paper <br />