Laserfiche WebLink
PC : 3-17-88 <br /> ER-88-1/GP-87-16/ <br /> zR-87-35/SU-87-23 <br /> i <br /> must be approved by the County of San Joaquin Department <br /> of Public Works prior to approval of the Final Map. <br /> b. If improvements referred to herein are not completed prior <br /> to the approval of the Final Map, the subdivider shall <br /> execute an Agreement with the County of San Joaquin which <br /> will ensure the completion of improvements within one ( 1 ) <br /> year after filing the Final Map. <br /> c . The subdivider shall agree to and shall pay user ' s fees <br /> for the utility services from the time . the improvements <br /> are accepted by the County to the end of the fiscal year , <br /> or up to a one ( 1 ) year period, as the case may be . <br /> d. The interior street shall be dedicated and constructed to <br /> public road standards of a 50-foot farm and estate road. <br /> e . Foppiano Lane and Canepa Road shall be dedicated and <br /> improved on the subdivided side to County standards of a <br /> 6o--foot right- of-way road, which requires pavement <br /> widening to 20 feet from the right-of-way centerline . <br /> f . A public domestic water supply and distribution system is <br /> required. The well system shall include, but not be <br /> limited to, two (2 ) wells , a pressure tank, auxiliary <br /> power, a chlorinator , and a desander . <br /> g. Fire protection shall be in conformance with the require- <br /> ments of the County Fire Warden and the Waterloo-Morada <br /> Fire District . <br /> h. A terminal drainage system shall be provided to meet the <br /> requirements of the County Deparment of Public Works . <br /> i . The subdivider shall initiate the formation of a County <br /> Service Area prior to the approval of the Final Map for <br /> the operation and maintenance of the storm drainage and <br /> water systems . <br /> J . Public utility easements shall be as- required by the <br /> Pacific Gas and Electric Company and any other public uti- <br /> lity companies. <br /> k. All utilities serving this development shall be <br /> underground. <br /> 1 . . The Tentative Map shall be revised to include the above <br /> recommendations and the following : <br /> -15- <br />