Laserfiche WebLink
E i - t r sc <br /> 1 d y ii, <br /> ADDENDUM NO. 1 <br /> "E" log and caliper loci shall be provided to the Engincer and <br /> ' the County at the Contract"s 4�;pe��se. See section T-8 . 1 f� . <br /> T-8. 9 PERFORA` IOUS, WELL SCREE14 <br /> The well screen shall be manufactured in accordance with the <br /> aforementioned casing requirements . The perforations shall ba <br /> machine made, perpendicular to the axis of the casing, and of a <br /> louver form with the aperture facing downward. The aperture size <br /> . shall be three-thirty seconds ( 3/32) of an inch with thirty-six <br /> (36) openings per lineal. foot. The minimun area of openings shall <br /> F be 8 . 9 square inches per lineal foot. <br /> T--8. 14 DEVELOPMENT AND TEST PUMPING <br /> The Contractor shall furnish, install , operate, and remove a <br /> deep- well turbine punp for developing and test pumping the well . <br /> The pump shall have a ninimum 650 feet howl setting and shall <br /> have a capacity to pump 1000 gallons per minute against a head of <br /> 650 feet. The Contractor shall provide an air line, calibrated <br /> gage and air pressure to measure the elevation of the water in <br /> the well . The Contractor shall provide acceptable orifices, <br /> meters, or other approved devices to measure the flow rate. <br /> Sand production shall be less than 10 parts per million within 30 <br /> : minutes after coSmencenent of pumping at a maximum rate of 1000 <br /> gallons per nirute . Sand production shall be nsasur ed by a <br /> centrifugal sand separating Meter as described in Journal of <br /> American Waterworks Association , Vol . 46,No. 2 , February, 19E4 . <br /> The well shall be stepped developed commencing with a flow rate <br /> of 200 gallons per ninute. Flow rates (developnent steps not to <br /> exceed 15o gallons per :-1?rute) shall be gradually increased as the <br /> wetter clears until the naxiI[ml:m Yate is reached in consideration of <br /> reasonable drawdown . The drawdown shall not be allowed to reach <br /> into the screened area , The pump shall be allowed to surge back <br /> through the pump towns and through the perforated area frequently. <br /> Development to continue until no sett.lenent of the gravel pack is <br /> evident and sand content is less than the above limits. <br /> Following development operations the Contractor shall perform a <br /> corplete pumping test by pumping at a sufficient number of rates <br /> to deternine the drawdown cu ve as determined by the Engineer. <br /> Punping shall continue at each .rate for a sufficient length of <br /> time to bring about a relatively steady water level in the well . <br /> Upon a shut down of the pump at the end of the test the well will <br /> remain undisturbed for five minutes and then the Contractor will <br /> make a water elevation measurenent.' Flow rates to be tested are <br /> to be approximately 20% , 40%, 60t, 800 , and 100% of the maximum <br /> flow rate of 1000 gallon per minute. The Contractor will , upolt <br /> R completion of testing, deliver a copy of development and testing <br /> records to Engineer. <br /> Depths for dray-down and re,,�vpyy curves shall be nehsured and <br /> recorded at the following frequency: once every minute for the <br /> first. 32 minutes ; once every 2 minutes for the next 12 to 20 <br />