Laserfiche WebLink
TABLE 1 <br /> WELL CONSTRUCTION DETAIL <br /> Fayette Manufacturing Corporation <br /> 7675 W. Eleventh Street, Tracy, CA <br /> Page 1 of 1 <br /> Well <br /> Casing <br /> Size <br /> Total Well (inside Screen l <br /> General Installation Surface Depth diameter Well Casing Completion Screen Well Contaminant <br /> Well# Location Well Type Date finish (feet bgs) in inches) Material Type interval Status Scre Interval <br /> MW-1 On-Site GWM 07/18/95 asphalt 22 2 Sch 40 PVC 0.010" 5-22 ND Press. Grout <br /> MW-2 On-Site GWM 07/18/95 concrete 27 2 Sch 40 PVC 0.010" 5-25 Benzene, MTBE Over ril <br /> MW-3 On-Site GWM 07/18/95 asphalt 27 2 Sch 40 PVC 0.010" 5-25 Benzene Over II <br /> MW4 On-Site GWM 03/09/99 asphalt 26 2 Sch 40 PVC 0.020" 6-26 ND Press. ut <br /> MW5 On-Site GWM 03/09/99 asphalt 26 2 Sch 40 PVC 0.020" 6-26 ND Pres .Gr ut <br /> MW6 On-Site GWM 03/09/99 asphalt 26 2 Sch 40 PVC 0.020" 6-26 ND Pre s.Gr ut <br /> MW7 On-Site GWM 01/10/05 asphalt 20 2 Sch 40 PVC 0.010" 10-20 ND Pr ss.Gro t <br /> MW8 On-Site GWM 01/17/05 asphalt 20 2 Sch 40 PVC 0.010" 10-20 MTBE Overdrill <br /> MW9 On-Site GWM 08/31/09 asphalt 25 2 Sch 40 PVC 0.010" 5-25 ND /Press. Grou <br /> AS1 On-Site AS 09/02/09 asphalt 25 2 Sch 80 PVC 0.020" 20-25 MTBE Overdrill <br /> AS2 On-Site AS 09/02/09 asphalt 25 2 Sch 80 PVC 0.020" 20-25 TPH, Benzene, MTBE Overdrill <br /> TPH, <br /> Benzene,Ethyl benzene, <br /> DP1 On-Site SVE 09/01/09 asphalt 25 4 Sch 40 PVC 0.010" 5-25 Xylenes, MTBE Overdrill <br /> Benzene,Xylenes, <br /> DP2 On-Site SVE 09/01/09 asphalt 25 4 Sch 40 PVC 0.010" 5-25 MTBE Overdrill <br /> TPH, <br /> Benzene,Ethylbenzene, <br /> DP3 On-Site SVE 09/01/09 asphalt 25 4 Sch 40 PVC 0.010" 5-25 Xylenes, MTBE Overdrill <br /> l <br /> Notes <br /> GWM= <br /> SV=Soil Vapor probe <br /> SVE=Soil Vapor Extraction well <br /> AS=Air Sparge well <br /> Press. Grout=pressure grouting with overdrilling the top 5 ft bgs <br />