My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012939 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COMETA
>
12897
>
2600 - Land Use Program
>
LA-01-73
>
SU0012939 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:13:54 AM
Creation date
9/4/2019 11:30:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0012939
PE
2690
FACILITY_NAME
LA-01-73
STREET_NUMBER
12897
Direction
S
STREET_NAME
COMETA
STREET_TYPE
RD
City
OAKDALE
Zip
95360-
APN
20726011
ENTERED_DATE
1/16/2020 12:00:00 AM
SITE_LOCATION
12897 S COMETA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\COMETA\12897\LA-01-04\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
George.Rose .. .- <br /> August 21,2001, <br /> Page 2 <br /> Percolation'Tests <br /> A percolation test was performed to demonstrate the capacity for soil percolation for use with an on- <br /> site septic systema The depth of the test was determined by setting the casing adjacent to the first"sufficiently <br /> permeable material encountered(usually a thin,sandy soil) found to a maximum depth of 21-feet." <br /> The casing used for the test was a 2-inch diameter,Py4ipe with an open end on the top and bottom. <br /> Perforations were placed on the bottom 1 foot of the pipe wo(2) inches of"pea gravel"was placed in the <br /> bottom of the hole,the casing was installed,and one(1) foot of"pea gravel"was backfilled inthe annular <br /> 7space. <br /> A one (1).hour percolation test conducted on August 14 and 17,'200 1 ,in accordance with the <br /> requirements of SIC PHS-EHD. The placement of the test was in a'location that.could be used fora future . <br /> septic system. The percolation test conducted=on August 14,2001 was observed by Larry Godinho and the <br /> test conducted on August 17, 2001 was observed by Steven Shih 'of SJC PHS-EHD. .An electro:well <br /> sounder was used-to measure the water drop over an minimum interval of 10 minutes during the tests.The <br /> units of the sounder are in feet with a 11100-foot resolution. To convert to inches,the value on the field sheet <br /> ' was multiplied by 12. The 'percolation test'was conducted for a period'of.one hour. A satisfactory <br /> percolation rate was achieved for all the parcels. Table-I'presents a summary of percolation test information <br /> for the eleven(11)parcels conducted August 2001 and October 2000. <br /> Table 1. <br /> Summary of eleven(11) percolation tests. <br /> Parcel Number Size ' Percolation Depth of Test " Date of Test <br /> Rate <br /> New Parcel 17 2.10 acres 10 min/in 21'feet October-6,2000 <br /> New Parcel 18 2.40 acres 1.6 minhi ' 19 feet October 6,2000 <br /> ' New Parcel 19 2.06 acres <1.6 min/in 12 feet <br /> October 6,2000 <br /> New Parcel 20 2.15 acres 0.6 miQlin 21 feet August 14,2001 <br /> New Parcel 29 2..15 acres 1.5 min/in 8 feet August 14,2001 <br /> New Parcel 30 2.11 acres ' 1.3 min/in. 7 feet August 17,2001 <br /> New Parcel 31 2.19 acres 5.6 min/in I I feet August 14,200I <br /> New Parcel 32 2.47 acres 0.9 mintin '2 1 feet August 14,2001. <br /> New Parcel 33 , 2.10 acres 2.5 minlin 20 feet. August 14,2001 <br /> New Parcel 34 2.10 acres 1.7 min/in 20 feet August 14;2001, <br /> New Parcel 35 2.10 acres . 1.1 min/in 20 feet : August 14,2001 <br /> a - <br /> ti <br /> j *4504♦ <br />
The URL can be used to link to this page
Your browser does not support the video tag.