My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7675
>
3500 - Local Oversight Program
>
PR0544802
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 11:31:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544802
PE
3528
FACILITY_ID
FA0005153
FACILITY_NAME
FAYETTE MANUFACTURING CORP
STREET_NUMBER
7675
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014012
CURRENT_STATUS
02
SITE_LOCATION
7675 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> ATC Associates SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all ATC worksites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> I <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task. <br /> 7ask(s) Condition.: Personnel Garmen (s) <br /> Working Near Vehicle Orange Vests <br /> 1 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all ATC hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Orange cones or barricades and caution tape will be <br /> used to mark off work zone where traffic is present. <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE. <br /> PAGE 10 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.