Laserfiche WebLink
r <br /> ATC Associates SITE SAFETY PLAN <br /> On-site communications: ❑ Radio 0 Verbal ❑ Hand Signals <br /> ❑Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio ® Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> (i.e., gloves, coveralls) will be placed in 55-gallon <br /> drums and stored onsite with drill cuttings. <br /> Location of Wash Water. Restroom on-site <br /> Location of Toilet. Restroom on-site <br /> Location of Drinking Water. ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced during drilling <br /> activities will be stored on-site until disposal <br /> methods are determined. <br /> PAGE 11 <br />