s � <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Geologist or Professional Engineer. <br /> 6.0 PROJECTED SCHEDULE <br /> The drilling will require one to two days to complete. The field work can be scheduled when <br /> the workplan is approved. Once the soil borings-and groundwater sampling are complete and <br /> all laboratory results have been received, the data will be analyzed and the subsurface <br /> investigation report will be prepared. It is anticipated that the report will be submitted for <br /> regulatory review within four weeks following field activities. <br /> wA95122\WP-GL0V.doc 4 <br /> • <br /> SMTN <br />