My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7675
>
3500 - Local Oversight Program
>
PR0544802
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 11:31:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544802
PE
3528
FACILITY_ID
FA0005153
FACILITY_NAME
FAYETTE MANUFACTURING CORP
STREET_NUMBER
7675
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014012
CURRENT_STATUS
02
SITE_LOCATION
7675 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED BUDGET <br />!' FOR SUBSURFACE INVESTIGATION <br /> AT <br /> FAYETTE MANUFACTURING CORP. <br /> 7675 WEST ELEVENTH STREET <br /> TRACY, CALIFORNIA <br /> PAGE 1 OF 2 <br /> =The-estimated total budget is $134,562. The proposed scope of work is described in the attached <br /> letter. The estimated budget is valid for 30 days from the date of preparation: January 30, 1995. <br /> Task 1: File Review, Workplan Preparation, Permitting and Scheduling <br /> • Labor $ 1,450 <br /> • Permit Fees/Mileage/Expense 199 <br /> Task 1 Total: $ 1,649 <br /> Task 2: Installation of Three Groundwater Monitoring Wells <br /> • Labor $ 890 <br /> • Equipment/Mileage 130 <br /> • Subcontractor 3,428 <br /> • Laboratory Analysis- 311 <br /> Task 2 Total: $ 4,759 <br /> Task 3: Well Surveying, Monitoring, Development and Sampling <br /> • Labor $ 500 <br /> • Equipment/Mileage 307 <br /> • Laboratory Analysis 155 <br /> Task 3 Total: $ 962 <br /> Task 4: Report Preparation <br /> • Labor $ 1,350 <br /> • Administrative Expense 137 <br /> Task 4 Total: $ 1,487 <br /> NAPROPOSALT90547B.doc CanonteEnvironmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.