Laserfiche WebLink
f <br /> Thomas M. Gau -3- <br /> COMMENTS ON DEVELOPMENTS <br /> SU-97-5 <br /> 13. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on,the County tax rolls, or up <br /> to an eighteen-month period, as the case may be. <br /> ('Subdivision Map Act Section 56493) <br /> i <br /> 14. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices <br /> and San Joaquin County Standards and shall be shown on the improvement plans. <br /> (Development Title Section 9-1150.2) <br /> i <br /> TMI:RH:ti i <br /> RS-BBI 14_It <br /> E: N.[anuel Lopez, Deputy Director/Development <br /> I <br /> i <br /> � y <br />