My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8111
>
3500 - Local Oversight Program
>
PR0544804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/4/2019 1:31:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544804
PE
3528
FACILITY_ID
FA0003850
FACILITY_NAME
M&M BUILDERS SUPPLY INC
STREET_NUMBER
8111
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95304
APN
25014006
CURRENT_STATUS
02
SITE_LOCATION
8111 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> State W a" ter Resources Co_' trop Soard <br /> Division of Clean Water P"rti'gramsr , <br /> Winston H. Hickox 2014 T Street•Sacramento,Caliror is 95814•(91'6)227-4411 ., • „ • ' • , <br /> Mailing <br /> ailing Address: P.O.Box 944212•;acramento�calilortna4 2w3�120 <br /> Sec,etaryfor vfatrf,- ` Gray <br /> Davis <br /> En,i,onvewa( FAX(916)227-4530 Internet Address. �fwb �g me/uscGovnor <br /> Prro(eclian y <br /> I <br /> MAY 2 2 20100 <br /> Pauline Marguand <br /> M&M Builders Supply <br /> P O Box 1107 t <br /> Tracy, CA 95378-1107 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM, NOTICE OF ELIGIBILITY <br /> ,. .�:� t <br /> 'DETERMIN.ATION:'CLAIM NUMBER 015225;EOR`SITE`ADDRESS=8'111'1`1'TH'ST W;TRP.CY-- b <br /> Your claim has been accepted for placement on the Priority List in Priority Class "C"with a deductible <br /> of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. I <br /> Compliance Review: Staff reviews, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List, your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid, a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> jhave not complied with regulations governing site cleanup, you have not supplied necessary information <br /> or documentation, or your claim application contains a material error, the claim will be rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of all <br /> fcorrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> i invoices, (3) copies of technical documents (bids,narrative work description,reports), and(4) evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement <br /> I e�3 <br /> ,.L <br /> Compliance with Corrective Action Requirements: "In order to be reimbursed:for your eligible costs of <br /> cleanup incurred after December 2, 1991, you must have complied"with corrective action requ¢errients of <br /> Article 11,Chapter 16, Division 3,Title 23, California Code of Regulations. Article I 1 categorized the <br /> corrective action process into phases. In addition, Article 11 requires the responsible party to submit an <br /> California La vironmenta/Protection Agency <br /> �d Rrcyc%dPxper <br />
The URL can be used to link to this page
Your browser does not support the video tag.