Laserfiche WebLink
Specific Plan 1("Master EIR"); <br /> • There are no nev,mitigation measures that are required for the development of <br /> Neighborhoods E and G; <br /> • The Master EIR continues to remain valid;and <br /> • The development of Neighborhoods E and G is a subsequent project within the scope of the <br /> Master EIR. <br /> Subsequent to the preparation of the Expanded Initial Study,an Initial Study was prepared <br /> specifically for the project. The Initial Study confirmed that the Master EIR continues to remain valid <br /> and that the project is a subsequent project within the scope of the Master EIR. <br /> I5 <br />