Laserfiche WebLink
dated October 9-.2006) and the western property fine of Lot 1. In addition,.Development Title <br /> Section 9-1020.4(g) states street trees shall be required along street frontages where noise <br /> attenuation walls are required and shall either be placed in the yard or integrated.with a <br /> serpentine wall. The applicant will need to depict the masonry wall and street trees on the <br /> subdivision improvement plan, indicating how the.wali will be constructed: Laridscapirig of <br /> common areas (surrounding the noise attenuations walls)will be maintained ba Homeowner's <br /> Association. <br /> Restricted Access <br /> Pursuant to Development Title Section 9-1150.10, which states the developer shall proVide.a fence. <br /> or wall outside of the right-of-way along any public roadway to which access is prohibited,:it is' <br /> recommended a masonry wall with a.minimum height of six (6) feet be constructed. along the <br /> northern property line of Lots 3-20, 87-114, the western property line of Lots 24, 25, 81.-86, .tfe <br /> southern property line of Lots 2547 and the eastern property fine of Lots 2,'79, 48; and .115-117. <br /> Additionally, street trees shall be required along street frontages where noise atte'nu6tion walls`are <br /> required. They shall be placed in the yard or integrated with a serpentine wall (Development Title <br /> Section 9-1020.4[g)). <br /> Noise <br /> Development Title Section 9-1025.9 fists the Residential use type as a noise sensitive land use. <br /> An Environmental Noise Analysis was prepared by Charles M. Salter Associates, Inc. on <br /> September 27, 2005_ The first row of proposed residences facing Highway 12188 will be exposed <br /> to future traffic noise levels which exceed the 65 dB Ldn standard for San Joaquin County. In <br /> order to achieve the acceptable exterior noise level of 65d6 (Development Title Section 9- <br /> 1025.9), an eleven-foot barrier between Highway 12/88 and the northern property lines of Lots 1, <br /> 87-102, 108, 109, and 112-115 and the eastern property line of Lots 115 and 116 shall be <br /> constructed_ Additionally, a five-foot tail barrier shall be required from Lots 3 through 20. The <br /> applicant is proposing a solid, redwood fence for the noise barrier and has provided a letter from <br /> Charles M. Salter Associates, Inc. dated September 27, 2006, which states redwood fencing is <br /> acceptable"as long as the fence board has a surface density of approximately 3 pounds per <br /> square foot(e.g., 1-112 inch thick)." In addition, the redwood fencing may not have any cracks or <br /> gaps. However, pursuant to wall and noise barrier requirements in restricted access areas in <br /> Development Title Section 9-1150.10, a solid masonry wall shall be required along the northern <br /> property line of Lots 3-20, 87-114, and the eastern property line of Lots 115-117. <br /> Lot Line Adiustment <br /> After the Final Map is recorded, the applicant intends to process a Lot Line Adjustment between Lot <br /> 80 as depicted on the Revised Tentative Map dated October 9, 2006 and the southerly parcel to <br /> increase the size of Lot 80. Lot 80, in its current configuration before the proposed Lot Line <br /> Adjustment, is 8,000 square feet. <br /> Oak Trees <br /> The Trees chapter of the Development Title regulates development near oak trees. The applicant <br /> is not proposing the removal of the Heritage Oak Trees. The applicant may remove other Native <br /> Oak Trees with an Improvement Plan. Development restrictions apply within the protected zone <br /> of Native and Heritage Oak Trees. The protected zone extends 5 feet beyond the drip line. <br /> The applicant is proposing to remove the Native Oak Trees and preserve the Heritage Oak Trees <br /> by constructing a masonry wall outside the protected zone of the Heritage Oak Trees. This <br /> proposal would comply with the requirements of Development Title Section 9-1505.5. <br /> San Joaquin County PA-0500509, PA-05008441Lockeford Land Group <br /> Community Development page 4 <br />