Laserfiche WebLink
Conditions <br /> Use' Permit Application No.'`PA-04-780±was approved.by,the Planning Commrss on :on .The <br /> effective date,of approval is. This approval will expire ons which is,78 months from the <br /> effective date of approval,:unless t1) all Cohditions of-Approval Piave been complied:,with, (2).all <br /> necessary building perinits have been issued and•remain in force;and( 3).,all ecess <br /> nary:permits from <br /> other agencies Piave been issued and remain in force <br /> Unless otherwise specified; ail Conditions'of Approval and ordinance requirements shall be,fulfilled-° <br /> Ito the establishment ofi.the use and <br /> the issuance of any building parmits Those Condrtioris <br /> followed by a Section Number have been Went ied as ordinance requirements pertinent ao thin <br /> I apphcafion. Ortlinance'requrements cannot.•be modified; and other ordinance requirements may <br /> apply:' <br /> 1. COMMUNITY DEVELOPMENT�DEPARTMENT(Staff.Contact JeiiniferJolley 468-3161) <br /> a: BUILDING PERIi111T:. Submit an "APPLICATION=COMMERCIAL BUILDING,.PERMIT'. The Site. <br /> Plan irequired'as a part of the building permit nxiust be.prepared by a`registered civil engineer or <br /> licensed architect This Plan.Must r show drainage, driveway access details 1hial6dirij,gates; on-site- <br /> parking, landscaping,signs; existing and ,proposed utility services and grading (refer to.the "SITE <br /> PLAN CHECK LIST' for deta.iIs). A-fee is.req uired for the Site Plan review. '(Development Title. <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing small winery into a medium <br /> winery as shown on the Plan dated April 6, 2004.(Use Type: Wineries 8� Wine Cellars, Winery- <br /> Medium), The winery includes the following uses: <br /> (1) Existing: <br /> A. One 4,000 square foot production/storage building. <br /> B. One 1,900 square foot building for wine tasting, an office&retail sales. <br /> (2) Expansion: <br /> A. Construction of an additional 20,000 square foot production/storage building. <br /> B. Produce a maximum of 99,000 gallons of wine annually. <br /> c. MARKETING EVENTS: Marketing Events are subject to the.following regulations: <br /> (1) A maximum of eight(8) marketing events are permitted annually as specified in the Marketing <br /> Plan date stamped April 12,2004. <br /> (2) Marketing events must end by 10:00 p.m. (Development Title Section 9-1075.5 (m)[B-2]) <br /> d. . BUSINESS LICENSE: The applicant shall secure an approved. Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> San Joaquin County PA-04-1801Lockeford Winery <br /> Community Development Page 8 <br /> i <br /> i <br />