Laserfiche WebLink
ti <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-180 (UP) <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $ 650.00 per 1000 gross <br /> square foot of building designated as Manufacturing in the Lockeford area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolutions R-00-433) <br /> 2. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 3. Verification shall be obtained from the Solid Waste Division(468-3066)that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 4. A State National Pollutant Discharge Elimination System(NPDES) Construction Permit Notice <br /> of Intent(MOI) shall be filed with the State Water Resources Control Board if over one(1) acre <br /> of total ground is disturbed by a construction project. <br /> DTP:DG:ar <br /> P:\COMMENTS%UFWR 20041PA-0400180.wpd <br />