Laserfiche WebLink
Wine Manufacturing UP-01-0`�„ j <br />5 June 2001 <br />construction begins, the proponent must submit an NOI to comply with the permit to the State Water <br />Resources Control Board -and a SWPP must ail DanbBerchtold at (9e prepared. If h6) 255 -ere are 338 questions <br />Leo Sarnvenbout ho ais t{916) <br />rocess <br />or the storm water program, you may c <br />255-3049. Additional information can be found at the Storm Water website - <br />http://Www.swreb.ca.gov/Stormwtrlindex,html. <br />If the project will involve the discharge of dredged or fill material into navigable waters or wetlands, a <br />permit pursuant to Section 404 of the Clean Water Act may be needed from the US Army Corps of <br />Engineers. If a Section 404 permit is required by the Corps, the Board will review the permit application <br />to ensure that discharge will not violate water quality standards. For more information, contact the <br />Sacramento District of the Corps of Engineers at (916) 557-5250 or Matthew Reischman with the <br />Regional Board at (916) 255=3120. <br />If you have any questions about the RWD process, please telephone meat (916) 255-3116. <br />TIMOTHY R. O'BRIEN <br />Waste Discharge to Land Unit <br />Lower Sacramento River Watershed <br />cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br />C ',1'r� jc�7 Fiics'.5i:�s`,i�1 ist. C:or���4;lleydlc:[ii�71 aJoc <br />