My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000905
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17715
>
2600 - Land Use Program
>
MS-92-50
>
SU0000905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:03 AM
Creation date
9/4/2019 6:17:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000905
PE
2622
FACILITY_NAME
MS-92-50
STREET_NUMBER
17715
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
ENTERED_DATE
10/5/2001 12:00:00 AM
SITE_LOCATION
17715 E HWY 88
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\17715\MS-92-50\SU0000905\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> MS-92-50 <br /> STEVEN BIGLIERI <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to the approval of the Parcel Map. <br /> Those Conditions followed by a Section Number or other Statutory <br /> Requirement are based on Ordinance Requirements. Ordinance <br /> Requirements cannot be modified. <br /> 1. DEPARTMENT OF PUBLIC WORKS: <br /> a . A Parcel Map is required. (Planning Title Section 9- <br /> 9112) <br /> b. The remainder shall be designated as "Designated <br /> Remainder" on the Parcel Map. (Subdivision Map Act <br /> 66445) <br /> C. The Traffic Impact Mitigation Fee will be required when <br /> parcels are developed. The fee is due and payable at the <br /> time of building permit application. (The fee currently <br /> is $2 , 096 . 00 per single family dwelling unit in the <br /> Lockeford area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> (Resolution R-90-304) <br /> d. The owner of APN 019-220-23 shall execute an Irrevocable <br /> Offer to Dedicate a twenty-five foot (25 ' ) wide right-of- <br /> way along the easterly property line from State Highway <br /> 88 to the northerly property line. (A $200 . 00 fee <br /> currently is required for processing per Planning Title <br /> Section 9-10502 in addition to a copy of the Grant Deed <br /> and a legal description of the parcel to be offered for <br /> dedication. (Planning Title Section 9-9430 , 9-9431) <br /> e. The owner of APN 019-220-22 shall execute an Irrevocable <br /> Offer to Dedicate a twenty-five foot (25 ' ) wide right-of- <br /> way along the easterly property line from the southerly <br /> property line of Parcel 1 to the northerly property line <br /> of Parcel 1 . (A $200 . 00 fee currently is required for <br /> processing per Planning Title Section 9-10502 in addition <br /> to a copy of the Grant Deed and a legal description of <br /> the parcel to be offered for dedication. (Planning Title <br /> Section 9-9430, 9-9431) <br /> f . The frontage improvements for the right-of-way to be <br /> offered for dedication in Recommendation No. e above <br /> across Parcel 1 shall be constructed in conformance with <br />
The URL can be used to link to this page
Your browser does not support the video tag.