My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004324
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18819
>
2600 - Land Use Program
>
PA-0200428
>
SU0004324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:09 AM
Creation date
9/4/2019 6:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004324
PE
2632
FACILITY_NAME
PA-0200428
STREET_NUMBER
18819
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
APN
01924018
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
18819 E HWY 88
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18819\PA-0200428\SU0004324\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOM : � FAX NO. :2099315185 i9. 09 2003 04:05PM P10 <br /> ADDITIONAL INFORMATION REQUIREMENTS <br /> CHOCOLATE MANUACTURING FACILITY � <br /> CLEMENTS, SAN JOAQ UIN COUNTY <br /> Please provide the following information in a report prepared by a California Registered <br /> Engineer. <br /> 1. Describe the facility, the items that will be available for purchase,the anticipated number <br /> of customers,and days of operation. + <br /> 4/2. Describe the products that will be manufactured and the waste materials associated with <br /> each product. Describe how off-specification, spoiled,or contaminated materials will be <br /> disposed. <br /> /3. Describe cleaning procedures,equipment,and chemicals that will be used in sanitation 1 <br /> activities for the food processing. <br /> 4. Describe all sources of wastewater(domestic and industrial including cooling water) and <br /> estimate the flow rates. Provide estimates of wastewater quality based on samples of <br /> similar operations or published data. Provide a chemical characterization of the <br /> wastewater and cooling water quality, includingiochemical oxygen demand, total <br /> suspended solids,total dissolved solids,nitrogenous compounds,and volatile organic <br /> chemicals. <br /> /5. provide loading rate calculations for the process wastewater septic tank and describe how <br /> the treatment is adequate to protect groundwater quality from degradation. Because the <br /> facility is proposing to discharge chocolate manufacturing wastewater to the septic tank, <br /> additional treatment will be required. If appropriate, provide a description of the revised <br /> pretreatment system and septic tank/leach linelseepage pit construction and an explanation <br /> of how the wastewater disposal is protective of groundwater quality, <br /> 6. Describe procedures that will be implemented to prevent the discharge of fats/oils/grease <br /> to the leachfield. Describe how odofs arising from an overloaded septic tank or leachfield <br /> will be prevented. <br /> ly.4 7. Describe how cooling water will be disposed of. If surface impoundments will be used to <br /> store wastewater, provide diagrams and a description of the planned impoundment, <br /> location, size and depth, construction materials,inlet and outlets,depth to groundwater <br /> below the bottom of the pond, and existing or planned groundwater monitoring wells. <br /> i <br /> A 8. Allowing for two feet of freeboard, what is the approximate storage capacity of the <br /> wastewater pond(s)? Provide a water balance that evaluates the containment structures <br /> ability to provide sufficient capacity on a month-by-month basis. Include monthly <br /> evaporation, precipitation, and irrigation rates as well as monthly discharge volumes. <br /> Rtiinfall shall be based on the 100-year return period total annual precipitation. <br /> /9. Describe management provisions that will be implemented to prevent the occurrence of <br /> flies, mosquitoes,odor nuisances, and problems such as pond overflows (maintenance <br /> plans, standby pumps or generators, and contingency plans,etc.). <br /> � 1 <br /> vb+eJapin,.lan I35&s�Idtiim718on lohvlal �ohplm,Bo ear 111 MgMAlj <br />
The URL can be used to link to this page
Your browser does not support the video tag.