Laserfiche WebLink
PROM � FAX NO. :2099315186 �9. 09 2003 04:08PM P19 <br /> r <br /> 14. CEQA documentation for the site construction and wastewater treatment and disposal <br /> system providing identification and analysis of potential impacts associated with the <br /> facility,and a description of required mitigation measures. <br /> Well you got us on this one. We did not previously supply this information as was <br /> the case with virtually everything else you asked for. <br /> ` however it is my understanding that there are three major phases in the <br /> development process as provided by CEQA: these would be the])The Pre- + <br /> Application Phase,2)The Application Phase, and Whe Review Phase, <br /> All state and local list agencies are required to the <br /> �' 4 � type of information and the <br /> criteria they will use in evaluating a project application. Your department did not <br /> mention any requirement to supply CEQA documentation in your 21 October <br /> 2002 Response to San Joaquin County Use permit application PA-02-0425. <br /> As the lead agency I believe it was your responsibility to inform me prior to now <br /> that this level of environmental study would be required. <br /> I <br />