Laserfiche WebLink
yr , <br /> FROMr } FAX N0. :2099315186 3. 06 2003 04:52PM PI2 <br /> realize It. It will produce jobs; it restores and beautifies a historical <br /> building, and will have a positive Impact on the surrounding community, <br /> I do not however understand the relevance of your comments with <br /> regards to approving ticsystem <br /> PP 9 r;•�r septic at this point. <br /> Q. You.recently mentioned that there Is no storm drainage for the site. <br /> As indicated on our site approval application, and on drawings submitted <br /> for permit purposes our proposed facility in located within County Service <br /> Area (CSA)43 which will provides storm drainage to the township of <br /> Clements. I have requested a written will serve letter on three separate <br /> occasions at the Public Works Department Counter. Each time I have <br /> been told that our project is located within CSA 43 and no written will <br /> serve letter is required nor will be Issued. Should you have any questions <br /> regarding the availability of storm drainage our site please contact bean <br /> Gilman at 468-3059. <br /> R. A point of correction conceming our wastewater makeup. <br /> We do not actually manufacture chocolate (cocoa liquor, cocoa butter, <br /> sugar, lecithin, and vanilla) in the area that utilizes floor drains. Our main <br /> product is actually chocolate sauce. We manufacture three main types of <br /> sauce but by far the most popular is our Fat free version, which contains <br /> mostly water with the addition of sugar, cocoa powder, dry non-fat milk, <br /> whey protein concentrate and flavors. <br /> S. You have mentions tat since the build' s rown in size so obviously <br /> must our water,reguirements. <br /> This is not true. Our primary use of water is a function of public restrooms <br /> and number of employees, We have been cramped for several years now <br /> and we have planned a facility that we will not soon outgrow. <br /> T. Ido not understand why xou ar_e_discussing special requirements of my <br /> project with hmLft contractors but have et to tell mei <br /> I have heard from at least three different contractors (all prior to March 27, <br /> 2003)that you were going to make this your"pet" project until the day you <br /> retire 2 years from now. You stated that you would be on-slte to supervise <br /> the Installation of every piece of pipe and every place of gravel of our <br /> system. You further went on to say that you were going to place me on a <br /> special permit that must be renewed every year and that you would be <br /> doing the annual inspections personally. All this Information has been <br /> provided to others but yet you have not given me these requirements <br /> since we submitted our report three months ago. <br /> Page 8 <br />