Laserfiche WebLink
FROM,-: FAX NO. :2099315186 (fig. 06 2003 04:51PM P11 <br /> i` our site pian to accommodate the landscaping and the leachfleld is <br /> approximately 95'x 60' = 5,700 ftz <br /> We also have purchased an additional 2.6 acres since our original site <br /> approval for future expansion and for the location of the 100% reserve <br /> leach field. <br /> Ik <br /> N. )Lou have recentlycommented that the deslan of ourseatic system is <br /> bare) adequate and would have been JmAossibCe with put the purchase of <br /> the additional 2.6 acres. <br /> I am not an expert in septic system design but my understanding is that <br /> this is a Rolls Royce quality system that is hugely over sized. For <br /> example, the obvious areas to me that are conservative include the <br /> following; <br /> 1. 15 gallons of water/day/employee—This means that each and <br /> every employee is using the toilet about 9-10 times/day/each and <br /> every day. Very unlikely. <br /> 2. Wash down water of approx 325 gallons/day--This Is the <br /> equivalent of our wash down hose running continuously, everyday <br /> for 75 minutes. This is way over the amount of water we consume. <br /> 0. You have mentioned that." are tr fp_g.tq silo in additional uses„such as a <br /> Cafe. You specifica1ly mentioned that I let It slip to Kermil.Parrow upQn an <br /> inspection meeting at our faciiity. <br /> C I apotogize if our meaning of a retail shop was not clear. Our main <br /> product line is chocolate dessert toppings. It has always been our <br /> i intention to offer hot coffee and hot chocolate products that highlight our <br /> i products. We also have long considered a simple ice-cream shop, Our <br /> vision Is an in-out-burger approach to offerings. Keep the offerings simple <br /> yet high quality while again emphasizing our chocolate ice cream <br /> toppings. Don Chesney's report mentions that additional wastewater <br /> constituents may consist of coffee, etc, (see page B). Chesney's report <br /> also mentions (see page 13)that kitchen water from the existing building <br /> would be plumbed to the grease trap. So you can see that the Chesney <br /> report and our site application are more technical in nature and did not go <br /> Into details regarding the exact offerings of our retail store. I again <br /> apologize for any confusion but it is clear that we did not attempt to "pull <br /> one over on you". <br /> P. You recently mentioned that the original zoning for my project was <br /> incorrect and that.I am forte ata that a lot of people have allowed me to <br /> even gat this far. <br /> I have always believed in this project and have worked long and hard to <br /> get to the stage where it Is. I also appreciate the work and cooperation of <br /> many people in San Joaquin County and the township of Clements that <br /> have understood my vision for this project and have worked with me to <br /> Page 7 <br />