Laserfiche WebLink
FROM : � FAX NO. :2099315196 Apr. 29 2903 11:17AM PS <br /> I <br /> B. Your conditions of approval do not indicate that your <br /> approval Is contingent upon the prior approval of another, different <br /> government agency. <br /> C. Second, I submitted the information requested by the <br /> Water Board on March 17th as well as again last week. Evidently <br /> because of State budget cuts they do not anticipate even looking at <br /> my file prior to the middle of May. If this is true it will be a hugely <br /> damaging blow to our schedule and our business. I cannot imagine <br /> why, given the exposure and knowledge you have of my project, <br /> you are not able to cooperate with me and allow me to move <br /> forward. <br /> D. Thirdly, most people knowledgeable of wastewater and <br /> who are familiar with the details of our project believe we are too <br /> small to be of a significant concern to the State Board. <br /> E. Tim Q% the CalifoMig Regional Water Quilll!yoa has asked <br /> me. "What is it aboutyour project Chet has environmental.health..(gan <br /> Joaguin County) so unea, <br /> sy ab u our project? <br /> I told him I do not honestly know, I myself am Intrigued. What have you <br /> told him? The concern for buses seems a common thread. <br /> F. You.haveme "lt Is t o utilizeAseptic s tem on an <br /> ind-usbial Umioct_likeyouEC, <br /> It is very disconcerting If you actually feel this way at this late date after all <br /> I have done. <br /> The system that Chesney consulting designed has a number of large <br /> margins of Safety incorporated as key elements of its design. I am not <br /> even going to reiterate the total margin of safety in this document. <br /> As a practical matter since moving to San Joaquin County 8 years ago, <br /> we have been at the same facility utilizing a septic system that was never <br /> sized or designed for the type of use we are proposing. We have had no <br /> problems and to the best of my knowledge the system was only recently <br /> pumped out for the first time. <br /> G. )Lou haye_stated that_we haX%ScpMpleteIV changed our nroi .,.e[r1 "W <br /> first promised it. <br /> There have indeed been numerous small changes to the design and <br /> layout of our facility, as you would expect when designing a brand new <br /> facility. We have however not changed the main concept of what we are <br /> doing. <br /> The biggest change Is that we are not putting our offices In the 26d floor of <br /> the brick building but rather are locating them on a Me=anine in the new <br /> metal building. The second floor of the brick building will now instead <br /> Page 4 of 4 <br />