Laserfiche WebLink
+�FROM <br /> + FAX N0. :2099315186 fpr. 29 2003 03:37PM P4 <br /> r <br /> B. Your conditions of approval do not indicate that your <br /> approval is contingent upon the prior approval of another, different <br /> government agency. <br /> C. Second, I submitted the information requested by the <br /> Water Board on March 17�h as well as again last week. Evidently <br /> because of State budget cuts they do not anticipate even looking at <br /> my file prior to the middle of May. If this is true it will be a hugely <br /> damaging blow to our schedule and our business. i cannot imagine <br /> why, given the exposure and knowledge you have of my project, <br /> you are not able to cooperate with me and allow me to move <br /> forward. <br /> D. Thirdly, most people knowledgeable of wastewater and <br /> who are: familiar with the details of our project believe we are too � <br /> small to be of a significant concern to the State Board. <br /> I <br /> E Tim C}' Tien of the Califarnla Realonal Water�uali Bo has asked <br /> me "What is It about ypur ro ect that as environmental health Sen <br /> Joa u Coun so uneasy about your project? E <br /> i told him I do not honestly know, I myself am Intrigued, What have you <br /> told him? The concem for buses seems a common thread. <br /> F. You have mentioned, "it I§ really a stretch to utilize acetic syste„ m on an <br /> industrtal ro'ect like ours". <br /> It is very disconcerting if you actually feel this way at this late date after all <br /> I have done. <br /> The system that Chesney consulting designed has a number of large <br /> margins of Safety incorporated as key elements of its design. I am not <br /> even going to reiterate the total margin of safety in this document. ' <br /> As a practical matter since moving to San Joaquin (county 8 years ago, <br /> we have been at the same facility utilizing a septic system that was never <br /> sized or designed for the type of use we are proposing. We have had no <br /> problems and to the best of my knowledge the system was only recently <br /> pumped out far the first time. <br /> G. You have.stated that we have completelyy ghanaed caur pM ect since we <br /> first proposed it. <br /> There have indeed been numerous small changes to the design and <br /> layout of our facility, as you would expect when designing a brand new <br /> facility. We have however not changed the main concept of what we are <br /> doing. <br /> The biggest change is that we are not putting our offices in the 2nd floor of <br /> the brtek building but rather are locating them on a mezzanine in the new ' <br /> metal building. The second floor of the brick building will now instead <br /> Page 4 of 4 <br />