Laserfiche WebLink
t `..,nt 22 02 Q1 : 1 1 P SCLHENQNE SPECIALTY FOODS 209 931 5186 P• 2 <br /> California Regional Water Quality Control Board - ; . <br /> Central Valley Region `�' ' <br /> Willston H.Hickox Robert Schneider,Chair <br /> Seereruryfo' Gray Davis <br /> Sacramento Maiu office Goverar <br /> r;viraonenfnl lntemet Address: http:/.t--s%-Mb.ca.gov/--rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,Califomia 95827.3UU3 <br /> Phone(916,255-3000,PAX(916)255-3015 <br /> 21 October 2002 <br /> G; Jose Rubianes Frank Giannecchini SCANNU9 <br /> San Joaquin County Comm. Develop, Dept. P.O. Box 10 <br /> 1810 E. Hazelton Ave. Linden, CA 95236 <br /> Stockton, CA 95205 <br /> I <br /> Ernie Schenone Jr. <br /> 3765 N. Wilcox 414 <br /> Stockton, CA 95215 <br /> PA-0200428(SA),SITE APPROVAL FOR CHOCOLATE MANUFACTURING AND <br /> DISTRIBUTIONFACILITY, CLEMENTS,SAN JOAQUIN COUN7'Y <br /> I have reviewed the Application Referral for the chocolate manufacturing and distribution facility in <br /> Clements, San Joaquin County distributed by the San Joaquin County Community Development <br /> Department. The Application Number is PA-0200428 (SA). The document briefly describes plans to <br /> remodel an existing 3,600 square foot building and add 12.,600 square feet of manufacturing and <br /> warehouse building space. The Application Referral doesn't describe any wastewater generation or <br /> disposal plans with the exception of aseptic tank and leach field areas. <br /> Food manufacturing generates high strength wastewater that is not suitable for dischard.e to a septic tabic <br /> I system. Because wastewater will be generated frons an industrial process, Waste Discharge <br /> Requirements (W DRs)will be required for the discharge of wastewater at the site. The property owner <br /> and/or facility operator shall submit a Report of Waste Discharge (RWD) at least 120 days prior to <br /> discharging wastewater at the site. California Water Code Section 13260 requires submittal of the RWD. <br /> Construction Stormwater Permit <br /> A NPDES General Permit for Storm Water Discharges Associated with Construction Activities, Order <br /> No. 99-28-DWQ is required when a project invoives clearing, grading, disturbances to the ground, such <br /> as stockpiling, or excavation. Currently, construction activity that involves soil disturbances on <br /> construction sites five acres or greater or which are part of a larger common plan of development or sale <br /> require a construction storm water permit. <br /> Dewatering Permit <br /> The proponent may be required to file a Dewatering Permit covered under Waste Discharge <br /> Requirements General Order for Dewatering and Other Low Threat Discharges to Surface Waters <br /> Permit, Order No. 5-00-175 (NPDES CAG995001). The following discharges may be covered by this <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br /> The energy challenge facing Califannia is real. Every Californian needs to take immediate action to reduce energy censumptiorn. <br /> For a list or simple ways you can reduce detrand and cul Your energy costs,see our Web-site at.hil -r!v.N,..--k - •.�•-- <br />