Laserfiche WebLink
f {{ <br /> 1 <br /> Kerry Sullivan _2- <br /> COMMUNITY DEVELOPMENT <br /> PA-02-428 <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards CW-CI I or CW-C 12 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a forty- <br /> two (42) foot wide right-of-way from the centerline of Fourth Street to the property line across the <br /> parcel's frontage. (A $350.00 fee currently is required for processing per Development Title <br /> Table 9-240.2 in addition to a copy of the Grant Deed and a legal description of the parcel to be <br /> offered for dedication.) (The fee due will be based on the current fee schedule.) <br /> I� (Development Title Section 9-1150.5) <br /> 4. The frontage improvements for 4th Street shall be constructed in conformance with the standards <br /> for one-half of an 84- foot right-of-way minor arterial. The construction of the frontage <br /> improvements will be deferred upon execution by the owner of a Deferred Frontage and Roadway <br /> Improvement Agreement or a Secured Deferred Frontage and Roadway Improvement Agreement <br /> with-a deposit equivalent to:their;estimated construction costs.prior,to approval of the <br /> Improvement Plan. (A $410.00 fee currently is required for processing per Development Title <br /> Table 9-240.2 in addition to a copy of the Grant Deed and an estimate for the required frontage <br /> improvements: The estimate shall be prepared by a Registered Civil Engineer with a typical <br /> section drawing on a form to be supplied by the Department of Public Works and submitted to the <br /> Department of Public Works for approval. As an option, the Department of Public Works will 1 <br /> prepare the drawing and estimate for an additional fee of$175.00.) (The fee due will be based on <br /> the current fee schedule.) <br /> (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee shall be required for this development, The fee is due and <br /> payable.at the time of,building permit application. (The,fee_currently is $634.00 per 1,000 gross , <br /> square foot of building designated as Manufacturing in Lockeford area. The fee shall be ' <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066)that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 8. The applicant shall install a Sensus brand water meter to County standards prior to final <br /> occupancy for all buildings on site. <br /> GK:BN:ar <br /> PACONLMENTSNSAWr 2001PA.C2478 wpd <br /> I <br /> I <br />