Laserfiche WebLink
i <br /> PA-0200428 (SA) Chocolate Facility -2 - -21 October 2002 <br /> Permit provided they do not contain significant quantities of pollutants and are either(1) four months or <br /> less iri duration, or (2) the average dry weather discharge does not exceed 0.25 mgd: <br /> a. Well development water <br /> b. Construction dewatering <br /> C. Pump/well testing <br /> d. Pipeline/tank pressure testing <br /> e. Pipeline/tank flushing or dewatering <br /> f Condensate discharges <br /> 9. Water Supply system discharges <br /> h. Miscellaneous dewatering/low threat discharges <br /> i <br /> Industrial Stormwater Permit <br /> Depending on the Standard Industrial Classification (SIC) code of the final project, compliance with the a <br /> NPDES General Permit No. CAS000001 for Discharges of Storm Water Associated With Industrial <br /> Activities may be required. The SIC codes of activities requiring coverage are listed in the General <br /> Permit. In order to obtain coverage by the General Permit, the proponent must submit a Notice of Intent <br /> to comply with the permit (NOI) to the State Water Resources Control Board and a Storm Water <br /> Pollution Prevention Plan (SWPPP) must be prepared. <br /> If you have any questions about the storm water program, please call Dani BerchtoId at (916) 255-3383. <br /> Additional information is available via the internet at the Regional Board's Storm Water website <br /> http.://u,ivtiv.swrcb.ca.aov/stormwtr/index.html. <br /> If you have any questions about the RWD process,please telephone me at (916) 255-3116. <br /> TIMOTHY R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> Lower Sacramento River Watershed <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> Y'..�❑n_1.nq.ic_\anl5',_S�arr'.C�urrnT,Pn ycc�filt;.�i isr. f'cT`.k hiz�tial'.._..,,. <br />