Laserfiche WebLink
Item No. <br /> PC: 4-15-93 <br /> SA-93-4 <br /> Page 2 <br /> PROJECT DESCRIPTION <br /> The appikmi is proposing the addition of cold storage to an existing apple packing shed to be completed <br /> In two phases over a period of f v&years. Phase 1 consists of constructing a 23,975-square-foot building <br /> for cold storage of packed frulL Phase 2 consists of constructing a 39,35[)-square-foot building for a <br /> controNed atmosphere cold storage building. Sewage disposal Is provided by an existing septic system, <br /> and water Is provided by an existing well. Storm drainage will be provided by an on-site drainage pond. <br />