Laserfiche WebLink
I. SIGNS: Sign details shall be consistent with Chapter 9-1710 of the Development Title and be <br /> included on the Site Plan. All portions of any sign shall be set back a minimum of five (5) feet from <br /> any future right-of-way line, including any comer cut-off (snipe). (Development Title Section 9- <br /> 1710.2[g]) <br /> m. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br /> Joaquin County Ordinance requirements will be applicable to the proposed project. The following <br /> conditions shall be addressed prior to submittal of a building permit application to the Building <br /> Inspection Division: <br /> 1. A building permit for each separate structure or building is required. Submit plans, <br /> Specifications and supporting calculations, prepared by a Registered Design Professional <br /> (architect or engineer) for each structure or building, showing compliance with the 2016 <br /> California Building, Existing Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes <br /> as may be applicable. Plans for the different buildings or structures may be combined into a <br /> single set of construction documents. <br /> 2. A grading permit will be required for this project. Submit plans and grading calculations, <br /> including a statement of the estimated quantities of excavation and fill, prepared by a <br /> Registered Design Professional. The grading plan shall show the existing grade and finished <br /> grade in contour intervals of sufficient clarity to indicate the nature and extent of the work and <br /> show in detail that it complies with the requirements of the code. The plans shall show the <br /> existing grade on adjoining properties in sufficient detail to identify how grade changes will <br /> conform to the requirements of the code. <br /> 3. The required plans must be complete at the time of submittal for a building permit. Plans must <br /> address building design and construction, fire and life safety requirements, accessibility and <br /> show compliance with the current California codes and San Joaquin County ordinances. A <br /> complete set of plans must include fire sprinkler plans, truss design submittals, metal building <br /> shop drawings, structural plans and calculations, plumbing, electrical and mechanical drawings <br /> and energy report. <br /> 4. A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix§ J104 for <br /> grading. All recommendations of the Soils Report shall be incorporated into the construction <br /> drawings. <br /> 5. For each proposed new building, provide the following information on the plans: <br /> a. Description of proposed use <br /> b. Existing and proposed occupancy Groups <br /> c. Type of construction <br /> d. Sprinklers (Yes or No) <br /> e. Number of stories <br /> f. Building height <br /> g. Allowable floor area <br /> h. Proposed floor area <br /> i. Occupant load based on the CBC <br /> j. Occupant load based on the CPC <br /> 6. The building shall be provided with an automatic fire sprinkler system or separated into <br /> conforming fire areas. <br /> 7. If high piled combustible storage is to be used in a building, an automatic fire sprinkler system <br /> will be required. <br /> PA-1700052 (SA) Conditions of Approval 3 <br />