My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0066665
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
27100
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0066665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 4:59:47 PM
Creation date
9/4/2019 6:34:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0066665
PE
4373
STREET_NUMBER
27100
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09329001
ENTERED_DATE
2/25/2013 12:00:00 AM
SITE_LOCATION
27100 E FLOOD RD
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\F\FLOOD\27100\SR0066665_INVEST INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 7 <br /> Sent: Wednesday, February 13, 2013 9:06 AM <br /> To: Ted Tasiopoulos [EH] <br /> Cc: Mondavi, Annette; Souza, David; Baker, Kevin; Marcus Knutson; Brett Mainer; <br /> dcook@)sioov.oro <br /> Subject: Linden Well Excavation Completion <br /> Ted, <br /> As I mentioned on the phone, we are at the bottom of the well and would like to begin <br /> to refill per the proper protocols for this type of operation. Drill Tech is the drilling <br /> contractor on site and Public Works will be responsible for the natural soil movement <br /> portion of the backfill. <br /> The total depth of the excavation within the well was 98 feet. There are two bore holes <br /> (6 inches in diameter) within the well; one of which reached the ground water level at <br /> 160 feet. <br /> The digging out of the shaft started at 10 feet below road level, where an 11 foot in <br /> diameter corrugated metal pipe (CMP)was cemented 12 feet into the ground. A steel <br /> ring was bolted to that CMP every 5 feet as the depth continued to the 70 foot depth. <br /> Wood lagging was placed in between the steel rings in order to shore the walls of the <br /> shaft as the depth continued, which looked similar to the inside of a wine barrel. From <br /> the 70 foot depth, the shaft size was reduced to a 5 foot by 5 foot square which was <br /> also lined with wood lagging to the final depth of approximately 98 feet. There was no <br /> water used in/out of the well during the excavation. <br /> Please advise me as to what measures need to be taken with regard to cement, grout, <br /> etc. and whether or not the material used to shore the shaft can be left in place. <br /> Again, I do not have any knowledge as to what needs to be done so please be as <br /> specific as you can be so that I can forward this to Drill Tech and Public Works. <br /> If you need additional information or have any questions, please let me know. <br /> Thank you, <br /> Chanda <br /> Sergeant Chanda Bassett <br /> San Joaquin County Sheriffs Office <br /> Investigations Division -Cold Case Unit <br /> (209) 468-4732 office <br /> (209) 468-4380 fax <br /> cbassett dsiaov.ora <br /> 2/22/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.