Laserfiche WebLink
included on the Site Plan. All portions of any sign shall be set back a minimum of five (5) feet from <br /> any future right-of-way line, including any corner cut-off (snipe). (Development Title Section 9- <br /> 1710.2[g]) <br /> 1) BUILDING CODE REQUIREMENTS: The following California Building Code and San Joaquin <br /> County Ordinance requirements will be applicable and shall be incorporated in the construction plans <br /> before submittal to the Building Inspection Division: <br /> i) A grading plan shall be submitted and approved and a grading permit issued by the Building <br /> Inspection Division prior to performing any excavation or filling of earth material: <br /> ii) The Construction Site Plan shall indicate the following: <br /> iii) Provide parking for the physically disabled. The space(s) shall be located as close as possible <br /> to the primary entrance (C.C. R. , Title 24). <br /> iv) Provide identification signs for the parking space(s) including the 'tow away" sign at each <br /> entrance or visible from each space (C.C. R. , Title 24). <br /> v) The slope of a parking space shall not exceed 1 /4 inch per foot (C.C. R. , Title 24). <br /> vi) Provide one van parking space. <br /> vii) Provide engineered plans and upgrades for restrooms conforming with all disabled access <br /> requirements (C.C. R. , Title 24, Uniform Plumbing Code, Table 4-1 ). <br /> 2. COUNCIL OF GOVERNMENTS (Staff Contact: Kimberly Juarez, 235-0438) See memo dated April 161 <br /> 2012. <br /> 3, SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (Staff Contact: Mark Montelongo, 559- <br /> 230-5905) See memo dated April 23, 2012. <br /> 4. ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Michael F. Escotto, 468-3443) <br /> See memo dated April 25, 2012, <br /> 5. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, 468-3000) <br /> See memo dated April 26, 2012. <br /> Conditions of Approval - 3 - <br />