Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-206 (UP) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $168.96 per daily trip-end generated in the <br /> Escalon area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> P:ICOA4.ffiIrS1Mf 20 TAA10D2M-Pd <br />