My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002699
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
17607
>
2600 - Land Use Program
>
SA-99-24
>
SU0002699
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:25 AM
Creation date
9/4/2019 6:41:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002699
PE
2633
FACILITY_NAME
SA-99-24
STREET_NUMBER
17607
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
17607 E FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\17607\SA-99-24\SU0002699\APPL.PDF \MIGRATIONS\F\FRENCH CAMP\17607\SA-99-24\SU0002699\CDD OK.PDF \MIGRATIONS\F\FRENCH CAMP\17607\SA-99-24\SU0002699\EH COND.PDF \MIGRATIONS\F\FRENCH CAMP\17607\SA-99-24\SU0002699\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> h. ACCESS AND CIRCULATION: The following requirements apply and shall be shown on the <br /> Site Plan: <br /> (1) Access driveways shall have a width of no less than twenty-five (25) feet for two-way <br /> aisles and sixteen (16) feet for one-way aisles. (Development Title Section 9- <br /> 1015.5[hD <br /> i. LANDSCAPING: the following requirements shall apply: <br /> (1) One (1) tree shall be required for each five (5) parking stalls, or portion thereof, and <br /> shall be evenly spaced throughout each parking lot. (Development Title Section 9- <br /> 1020.5) <br /> 2. RIPON CONSOLIDATED FIRE DISTRICT The following shall apply to this project: <br /> a. Phase 1: <br /> (1) Existing access road surface is sufficient for Phase 1, however appropriate measures <br /> need to be taken to ensure that the 20'width is maintained. <br /> (2) Provide an approved key box at the entrance gate to the facility, with keys to allow <br /> access to the facility in an emergency. (Section 902.4) <br /> (3) Provide detail on construction type of the proposed structures so that required fire <br /> flow can be calculated. When this is completed the District will advise of onsite water <br /> supply requirements, as per Appendix III-A of the 1994 Uniform Fire Code. Provide <br /> District with specifications for pump and system to be used for fire protection. <br /> (4) The propane facility is not indicated on the site plan. Indicate location and planned <br /> use (e.g.dispensing). Separation of LP-gas containers from buildings, property lines, <br /> and public ways shall be in accordance with Table 8204-A. (Section 8204.2) <br /> (5) Proposed fire riser must meet requirements of the Ripon Fire District. This will also <br /> be subject to water supply requirements. <br /> b. Phase 2: <br /> (1) Provide detail on construction type of proposed structure #10 so that required fire <br /> flow can be calculated. <br /> (2) Proposed roadway will be required to serve as a fire lane, and be marked as such. <br /> (3) Fire hydrants shall be located along the route of the fire apparatus access roadway. <br /> (Section(s)901.1 and 903.4.2) <br /> C. Phase 3: <br /> (1) Provide detail on construction type of proposed structure #11 so that required fire <br /> flow can be calculated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.