Laserfiche WebLink
COMMENTS ON DEVELOPMENTS MS-94-23 <br /> 8 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required when the parcels are developed. The fee currently is <br /> $0 . 267 per gross square foot of building as "Retail Service" <br /> and/or "Service Commercial" . The fee shall be automatically <br /> increased on January 1 of each year at the rate of 7 . 66 % thru <br /> the year 2005 . (Resolution R--91-327) <br /> 9 . The tentative right-of-way line of Arch--Airport/Sperry Road <br /> and Interstate I-5 off ramp shall be shown on the Parcel Map. <br /> (Development Title Table 9-410 . 3 & 9-1150 . 2) <br /> 10. Permanent driveway(s) shall be located a minimum of 200' from <br /> the future Interstate 1-5 off-ramp and shall be .restricted to <br /> right-turn only movements. Any driveways within this 200' <br /> limitation shall be temporary and shall be removed when the <br /> future Interstate 1-5 off-ramp is constructed. Left-turn <br /> movements from these temporary driveways shall not be <br /> permitted when the tentative Arch-Airport/Sperry Road is <br /> constructed and shall be noticed by a statement on the Parcel <br /> Map. (Development Title Section 9-1015 . 5h) <br /> c: Manuel Lopez , Deputy Director/Development <br /> i <br /> t <br /> 3 <br />