My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005750
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
920
>
2600 - Land Use Program
>
PA-0500726
>
SU0005750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:44 AM
Creation date
9/4/2019 6:44:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005750
PE
2631
FACILITY_NAME
PA-0500726
STREET_NUMBER
920
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
APN
19126022
ENTERED_DATE
11/3/2005 12:00:00 AM
SITE_LOCATION
920 W FREWERT RD
RECEIVED_DATE
11/1/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREWERT\920\PA-0500726\SU0005750\APPL.PDF \MIGRATIONS\F\FREWERT\920\PA-0500726\SU0005750\CDD OK.PDF \MIGRATIONS\F\FREWERT\920\PA-0500726\SU0005750\EH COND.PDF \MIGRATIONS\F\FREWERT\920\PA-0500726\SU0005750\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis <br /> Parkin <br /> The application lists a.160 square foot office as the only building associated with the business. The <br /> existing structures are not part of the business. The parking requirement for the Agricultural Waste Use <br /> Type is 2.5 spaces per'!000 square feet of building. This indicates the need for one (1) parking space, <br /> which shall be van accessible (Development Title Section 9=1015.3). <br /> All parking spaces, driveways, and maneuvering areas, including a minimum of the first 100 feet of the <br /> access,driveway, must be surfaced and permanently maintained with base material of appropriate depth and <br /> asphalt concrete or Portland cement concrete to provide a durable, dust free surface. Bumper guards shall <br /> be provided when necessary to protect adjacent structures or properties(Development Title Section 9- <br /> 1015.5[e]). <br /> .Fire Suppression <br /> The Lathrop-Manteca Fire District sent a memo dated April 5, 2006. The memo states that to commence <br /> construction beyond the foundation stage or storage of building materials, emergency vehicle access and <br /> adequate water for fire suppression must be provided in accordance with Section 901.3, Section 9022.1, <br /> Section 903.2 and Section 8704 of the 2001 California Fire Code. <br /> City of Lathrop <br /> The City of Lathrop sent a memo dated May 3, 2006. The memo stated the City's opposition to the project <br /> and outlined the sections of the Initial Study that the City felt were inadequate. The City listed concerns <br /> regarding odor, noise, traffic, and the omission of any reference to the City of Lathrop's Central Lathrop <br /> Specific Plan. <br /> The Community Development Department reviewed the comments from the City and decided to address <br /> the City's concerns in a new Initial Study. The revised Initial Study was posted on September 7, 2006. <br /> The City of Lathrop did not respond to the revised Initial Study. <br /> The City of Lathrop adopted the Central Lathrop Specific Pian (CLSP) on November 9, 2004. The Central <br /> Lathrop Specific Plan provides a comprehensive planning framework that guides development of an <br /> approximately 1,520 acre planning area within the currently agricultural area inside the city limits to the <br /> south of the project site. The Plan includes a mix of residential neighborhoods, retail, office service- <br /> related and other employment generating land uses, and public/semi-public uses such as schools, parks, <br /> and other civic oriented facilities. Approximately 6,800 dwelling units and 5 million square feet of office <br /> and retail uses are planned for the area. <br /> According to the Central Lathrop Specific Plan, the CLSP land uses, and the backbone infrastructure <br /> required to serve them, are designed to be developed in two primary phases, with the possibility of <br /> multiple sub phases. The two primary phases are intended to be developed sequentially, with Phase 1 <br /> designed to be able to function independently as a complete stand-alone system and Phase 2 designed <br /> to complete the system of backbone infrastructure required to serve the entire project. Phase 2 consists <br /> of the area within the CLSP north of De Lima Road. Ultimate buildout of the project is anticipated to take <br /> approximately fifteen years, depending on market conditions. <br /> The Central Lathrop Specific Plan states that as of the approval date of the Central Lathrop Specific Plan, <br /> the majority of the lands within the Specific Plan area are under Williamson Act contracts. These <br /> San Joaquin County PA-05007261Sanchez <br /> Community Development Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.