Laserfiche WebLink
GUIDANCE FOR LAND TREATMENT UNIT -2 - <br /> OPERATION <br /> 2 -OPERATION AND MAINTENANCE PLAN <br /> BEAR CREEK WINERY, SAN JOAQUIN COUNTY <br /> specific procedures for managing and controlling tailwater and storm water <br /> fertilizer usage. <br /> 6. Maintenance <br /> A detailed description of all equipment and site improvements associated with wastewater <br /> disposal, including design basis, site plans, mechanical systems description, piping and <br /> instrumentation description and diagrams <br /> Required runoff controls (narrative description and grading/drainage plan, including all <br /> berms, ditches, and other improvements needed to contain runoff and tailwater). <br /> Routine tailwater management practices (narrative description supplemented with drainage <br /> plan) <br /> Structural runoff controls <br /> Describe procedures and documentation requirements for: <br /> Inspections <br /> • Maintenance/repairs <br /> Routine equipment maintenance, calibration procedures, and troubleshooting procedures; <br /> Application cycles <br /> application duration <br /> resting period <br /> variations due to weather constraints <br /> Odor prevention and control <br /> Describe best management practices to be employed to prevent nuisance odors emanating <br /> from the pasture and any storage/tailwater ponds. <br /> 7. Monitoring and Reporting <br /> Monitoring procedures <br /> Sampling procedures <br /> Sample handling and storage <br /> Use of field operations documentation logs <br /> Report development <br /> Emergency notification and action procedures in the event of imminent violations of the <br /> WDRs <br /> Quality assurance program to ensure that all calculations and monitoring reports are <br /> reviewed and certified by the appropriate persons <br /> V�m JoaquinNmil� OhrimT\ mjw F mkBur6 Wt D,d <br />