My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002482
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
14210
>
2600 - Land Use Program
>
SA-01-47
>
SU0002482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:38 AM
Creation date
9/4/2019 6:45:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002482
PE
2633
FACILITY_NAME
SA-01-47
STREET_NUMBER
14210
Direction
W
STREET_NAME
STATE ROUTE 4
City
STOCKTON
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
14210 W HWY 4
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\F\HWY 4\14210\SA-01-47\SU0002482\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A - 01 - 47 <br /> This permit application requests zoning and planning approval for a 130' Monopole tower with a 6' <br /> in diameter base (Please see attached site plans.) The plans indicate four (3) sets of PCS wireless <br /> carriers panel antenna (9 panel antenna each). The typical size of panel antenna are 6' tall by 8" <br /> wide. Each set of PCS antenna must be spaced approximately 10' from tip to tip apart for <br /> clearance. SBA is leasing approximately 10,000 square feet of property from the earlier mentioned <br /> property owner for the location of this tower as well as any/all accompanying radio cabinets/huts <br /> that future carriers will require space for. The entire area will be secured by a 6' chain link fence <br /> topped with three strands of barbwire for the protection of the carrier's equipment. A propane <br /> back-up generator may be installed for emergency power on one of the existing equipment pads. <br /> The generator will be a model approved by the building/fire inspection department. <br /> The required utilities will be brought in from the nearest available source. Access and easement <br /> issues have been approved by the property owner. Direct access to the project location is within the <br /> subject parcel. No public utilities such as water or sewer are necessary for the operation of this site. <br /> No products or materials will be produced or stored at this site. This site will be an unmanned <br /> service facility and will be serviced approximately once a month by maintenance technicians (1-2 <br /> hours). There are no designated parking spaces within the lease area as the site will not have <br /> employees or customers. Construction of the lattice tower will take approximately 6 weeks and <br /> each carrier's installation of antenna will take 3-5 days. <br /> SBA will be responsible for managing the site, ensuring that all of the safety requirements are met. <br /> SBA will comply with all of the local, state and federal safety requirements imposed on new tower <br /> facilities. Emergency telephone numbers will be placed at the site. Several equipment pads will be <br /> provided for the carriers to place their equipment cabinets and/or prefabricated huts. <br /> Page 2 of 2 <br /> Collocation Project Description <br />
The URL can be used to link to this page
Your browser does not support the video tag.