Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-232 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee is currently$187.36 per additional daily trip-end <br /> generated in the Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> P1COMMO:NTSISM\ 20W A-0400232.apd <br />