Laserfiche WebLink
Table 2. Percolation Test Summary <br /> Test No., Percolation Percolation Test Duration Comments <br /> Date Tested Test Rate (see notes) <br /> Depth (ft.) (minutes/inch) <br /> P1 (Parcel 1) Satisfactory <br /> 7118/13 3.28 41.7 4 hr. <br /> Shallow Test pert. rate <br /> P2 (Parcel 2) <br /> 7/18/13 3.18 62.5 4 hr. Test failed* <br /> Shallow Test <br /> P2 (Parcel 2) Satisfactory <br /> 7/18/13 7.85 9.6 4 hr. perc. rate <br /> Deep Test <br /> Note. A satisfactory percolation rate for a "shallow" test is less than or equal to 60 minutes per inch. A satisfactory <br /> percolation rate for a "deep"test is less than or equal to 30 minutes per inch. <br /> Only a shallow or a deep test is required to pass for the lot to pass. <br /> Discussion of Percolation Test Results <br /> The soils within the percolation test area have demonstrated a satisfactory percolation <br /> rate for the use of a standard septic system in accordance with the requirements of the <br /> San Joaquin County Environmental Health Department. <br /> Discussion of Septic System Sizing <br /> Septic system construction utilizing leach lines and seepage pits should follow the San <br /> Joaquin County On-Site Wastewater Disposal Standards (2003) where applicable. <br /> LOGE 1307 Page 7 <br />