My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
6250
>
2900 - Site Mitigation Program
>
PR0542086
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:03:21 PM
Creation date
9/5/2019 9:23:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542086
PE
2965
FACILITY_ID
FA0004502
FACILITY_NAME
NORMANS NURSERY
STREET_NUMBER
6250
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09317009
CURRENT_STATUS
02
SITE_LOCATION
6250 ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OJ`KLEINFELDER <br /> Bright Noigi Right Sahitiom <br /> 7 . Norman 's Nursery collects and analyzes water samples from the on-site run-off <br /> basin monthly. Water from the discharge of the dewatering wells also is pumped to <br /> the Basin B and sampled weekly. The samples are analyzed for nitrate <br /> concentrations . KI-Nitrifier (a biological additive which increases nitrate <br /> consumption in the basin) is added when high concentrations of nitrate are <br /> reported in the samples . Basin water is reused in water trucks onsite for dust <br /> control , as needed . <br /> This BMP is still being used. <br /> 8 . Quarterly, the water contained in Basin B is sampled and analyzed for nitrate . <br /> This BMP has been implemented for nitrates-nitrogen and ammonia-nitrogen <br /> analysis; and only when the culverts are closed and Basin B contains <br /> irrigation tailwater. Otherwise, the discharge from Basin B is sampled (see <br /> MRP by the RWQCB). <br /> 9 . Influent water samples will be collected and analyzed on an annual basis . The <br /> Norman 's staff collects surface water samples entering the site from the south <br /> (Duarte property) when applicable . <br /> This BMP has been implemented as modified above. <br /> 10 . The non-operational Windmill Well was properly abandoned in accordance with <br /> State and local water well regulations . <br /> This BMP was completed by Purviance Well Drilling in late October 1998. <br /> 11 . Norman 's Nursery will plant River Birch along the western and northern perimeters <br /> of Basin B . The water loving trees will increase the uptake of shallow groundwater <br /> near the perimeter of the basin . In addition , the variety of trees may also aid in <br /> reducing the concentration of nitrates reported in groundwater beneath the site . <br /> In April 1998, Norman 's Nursery completed planting approximately 90 <br /> European White Birch (sp. Betula Pendula) along the north and east edges of <br /> Basin B. According to the nursery's experts, the trees are hydrophilic. <br /> However, like the adjacent orchards, it may take time for the root ball to <br /> develop to greater depths and have a significant effect. <br /> 117226 . E02/ST013R0176 Page 30 of 40 January 31 , 2013 <br /> Copyright 2013 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.