Laserfiche WebLink
qO IN <br /> COUNTY OF SAN JOAQUIN <br /> � THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> ` DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE MANUEL SOLORIO <br /> • �4[,p OP�`P STOCKTON,CALIFORNIA 95201 INTERIM DEPUTY DIRECTOR <br /> (209)468-3000 <br /> THOMAS R. FLINN FAX(209)468-2999 STEVEN WINKLER <br /> DIRECTOR DEPUTY DIRECTOR <br /> FRED PAYTON <br /> March 4, 2002 BUSINESS ADMINISTRATOR <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Leanne Mueller <br /> FROM: Ben E. Neely Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0200045 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE ONE 0.28 <br /> ACRES PARCEL INTO TWO 0.14 ACRE PARCELS, LOCATED ON THE SOUTH <br /> EAST CORNER OF GERTRUDE AVENUE AND MYRTLE STREET <br /> (SUPERVISORIAL DISTRICT 2) <br /> PROPERTY OWNER: Harry Islas <br /> APPLICANT: Kjeldsen, Sinnock&Neudeck, Inc. <br /> ADDRESS: 147 N. Gertrude Avenue APN: 157-343-02 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. In addition, the existing San Joaquin County and City of Stockton Flood Insurance <br /> Studies, which delineate flood risks, floodplains, and floodway areas, are currently being reevaluated. <br /> The reevaluation is being conducted by the Federal Emergency Management Agency, Region IX, <br /> Building 105, Presidio of San Francisco, California 94129-1250, telephone (415) 923-7186. The <br /> reevaluation may delineate additional flood risks. The official flood maps are available for review at the <br /> Department of Public Works, 1810 East Hazelton Avenue, Stockton. These flood maps will be updated <br /> when the reevaluation process is completed. <br /> Gertrude Avenue has an existing right-of-way width of 50 feet and a planned right-of-way width of 50 <br /> feet. Myrtle Street has an existing right-of-way width of 25 feet and a planned right-of-way width of 50 <br /> feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. <br /> The fee is due and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br />