Laserfiche WebLink
r ) <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified,and other ordinance requirements may apply. <br /> The Revision of Approved Actions for Use Permit Application No. UP-96-06 was <br /> approved by the Planning Commission on . The effective date of approval is . This <br /> approval will expire on , which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been issued and remain in force, and (3) all necessary permits <br /> from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified,and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jennifer Jolley, 468- <br /> 3161) <br /> a. IMPROVEMENT PLAN: Submit an IMPROVEMENT PLAN. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil <br /> engineer or licensed architect. This Plan must show drainage, driveway access <br /> details including gates, on-site parking, landscaping, signs, existing and proposed <br /> utility services, and grading (refer to the "SITE PLAN CHECK LIST' for details). A <br /> fee is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the parking of two (2) trucks as an <br /> accessory use to an existing 170 person neighborhood temple as shown on the <br /> Plan dated February 9, 2001. <br /> c. STORM DRAINAGE: Any additional storm-water drainage created by new <br /> improvements shall be retained on-site. The drainage pattern and corresponding <br /> storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development <br /> Title Section 9-1135) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a durable, dust free surface. <br /> Bumper guards shall be provided when necessary to protect adjacent structures <br /> or properties.(DevelopmentTitle Section 9-1015.5[e]) <br /> e. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) If the parking area is to be used at night, parking lot and security lighting shall <br /> be installed. (Development Title Section 9-1015.5[g]) <br /> (2) Any lighting shall be designed to confine direct rays to the premises. No <br /> spillover beyond the property lines shall be permitted except onto public <br /> J <br />